Thameslink trains between St Pancras and Blackfriars may still be cancelled, delayed or revised until 9am. National Rail says allow up to 60 minutes extra.
Update, 8.44am: National Rail is still reporting “residual disruption” between St Pancras International and Blackfriars this morning, expected “until 09:00”. National Rail says “trains are returning to normal following a points failure”, which it says “was reported near City Thameslink”. Trains between these stations “may still be cancelled, delayed or revised”, and some “may not stop at all of its usual scheduled stations”. It advises passengers to “allow up to 60 minutes of additional time” and says “all lines have re-opened”. Tickets are accepted at no extra cost on other Thameslink and Great Northern trains, London Underground trains between London terminals, Southern services between London Victoria and the south coast, East Midlands Railway between Bedford and St Pancras International, and London Buses through central London. National Rail says passengers delayed today “may be entitled to compensation” and should keep their ticket and “make a note of your journey”.
Update, 2.21am: National Rail marked the incident cleared at 1.38am on Tuesday 24 November, with “Normal service between London St Pancras International and London Blackfriars”. It says the “disruption caused by a number of incidents between London St Pancras International and London Blackfriars has now ended.”
Update, 9.53pm on Monday: National Rail now advises allowing “at least 60 minutes extra time to travel”, down from 90 minutes earlier. It still expects disruption between St Pancras International and Blackfriars “until the end of the day”, and says trains between the two stations “may be cancelled, delayed by up to 20 minutes or revised”.
National Rail says the disruption followed “a fault with the signalling system in the City Thameslink area” and “a points failure at London Blackfriars”. It says Network Rail “repaired the affected equipment” and trains “can now run at normal speeds”.
- What: National Rail says trains between St Pancras International and Blackfriars “may still be cancelled, delayed or revised” after a points failure near City Thameslink. On Monday evening it said lines had reopened, but the service continued “to be severely disrupted”.
- Where: St Pancras International to Blackfriars, on Thameslink routes including Bedford to Brighton and Cambridge to Brighton.
- When: First reported at 1.56pm on Monday 23 November. National Rail marked it cleared at 1.38am on Tuesday 24 November, then reported residual disruption on Tuesday morning, expected until 9am.
During the disruption, National Rail said tickets were being accepted on “London Underground services between London Terminals” and on “East Midlands Railway services between London St Pancras International and Bedford”.
Source: National Rail live travel information. Last checked at 8.44am on Tuesday 24 November. We will update this story when National Rail or Thameslink say more.
Have your say